Gas leak found and fixed

January 19, 2021

Southwest Gas while performing their annual gas main leak inspections discovered a leak on the gas main to service tee near the East roundabout on Sonoran Vista Trail.  The gas main was dug up and a repair made on January 19, 2021 to resolve the issue.  The repair hole has been temporarily filled in and a…

November 12th, 2020 Board Meeting Minutes

November 30, 2020

Please click here to download a copy of the approved meeting minutes in PDF format. GRH November 2020 Meeting Minutes

August 12th, 2020 Board Meeting Minutes

November 30, 2020

Please click here to download a copy of the approved meeting minutes in PDF format. 8-12-20 Meeting Minutes

Good news on the water leak at the east gate

June 8, 2020

Hi Everyone! We just wanted to provide an update on the east gate area water leak… John Smith completed the valve replacements for the East entrance this morning (6/8/2020). He reviewed the piping between Tucson water and our valving and all looked good. There are no other identified leaks at this time. The cost to…

Water leak at East entrance – Under Review

May 28, 2020

All, We wanted everyone to be aware that we are currently investigating – and will be rectifying as soon as possible – a major leak at the East entrance. The other day, the east gate entrance had massive flooding that flowed all the way out to the road. John (landscape maintenance), in an effort to…

Landscape Email Notice Sent to Membership

May 28, 2020

Hello Everyone! I hope this message finds everyone safe during these crazy COVID times. As you know, the Board is making efforts to provide open feedback to the membership on various issues and I wanted to take a minute to talk a bit about landscape maintenance. Rather than hand out notices to individual members at…

May 6th, 2020 Board Meeting Minutes

May 16, 2020

Please click here to download a copy of the approved meeting minutes in PDF format. 5_6_2020 Green Ridge HOA Minutes

Newsletter Signup

Upcoming Events

Current Projects

Lot #6 – Roof Replacement

Estimated completion: 3/21/2026

Lot #20 – Window Replacement

Estimated completion: 3/7/2026

Lot #19 – HVAC Replacement

Estimated completion: 11/5/2025

Lot #30 – Solar Backup System

Estimated completion: 12/31/2025

Lot 35 – Pool resurfacing

Estimated date of completion – 8/12/2025